Program version : Portable_Q-Traf_1307
Run number 682 du 250817_01h49
________________________________________________________
> Loaded : E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Ultra_small_Square_1307\_in_traffic_model_data\parameters.csv

------------- VEHICLE - PARENT TYPES ------------------------------------------
Vehicle parent types count :      4

------------- VEHICLE - SUB PARENT TYPES ----------------------------------------
Vehicle sub parent types count :      4

------------- VEHICLE - SUB SUB PARENT TYPES = TRIPS MATRICES ------------------
Matrices trips count :   1

------------- Links categories ---------------------------------------------
links categories Count : 20
________________________________________________________

Number of scenario(s) :                1
________________________________________________________
                              << without arbo >>

------------- ZONES -------------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Ultra_small_Square_1307\_in_traffic_model_data\network_nodes_wkt_csv\reseau_square_espg27700_arrondi_au_m_09_zones.csv
Number of zones : 8 - id_max_zone : 8 (Number of zones autorized : 3000)

------------- PARK & RIDE --------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Ultra_small_Square_1307\_in_traffic_model_data\network_nodes_wkt_csv\reseau_square_espg27700_arrondi_au_m_09_poles_correspondance.csv
Number of P&R : 1 - id_max_Park_&_Ride : 1

----------- (NETWORK) LINKS --------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Ultra_small_Square_1307\_in_traffic_model_data\network_links_wkt_csv\Square_res_ESPG27700_v8.csv
Number of links in the network (without connectors) : 24
Number of links and connectors : 40 (autorized : 1500)

 ------------- NODES ------------------------
Number of nodes in the network (only link s ends - Without zones) : 12 - Id node max (with zones) : 20 (autorized : 3000)
Diameter of the network beetwen zones : 5 links (shortest paths beetwen x 1,5 et x 2,7)

________________________________________________________
CALCULS ASSIGNATION
Time (sec) ponderation / dist (m) in generalised cost travel : 25
Number of iterations (1..200) :  (5 iteration(s))

______________________________________________________
SCENARIO 1 : Network 2025

Matrix n° 1 de 2025 - Car11 (matrix_square_9_2025_Car11_PPH.csv
    Zones matrice absente(s) du reseau : Origine(s) :  - Destination(s) : 
    Number of OD in the file matrice csv : 8

Matrix n° 1  -  matrix_square_9_2025_Car11_PPH.csv   -    TOTAL (100%) : 1406,5 - Autorized (100%) : 1406,5 Car11

Iteration n° 1
Matrices n° : 1(8)
Total generalized cost of all road vehicles for the iteration : 1,291 E+6

Iteration n° 2
Matrices n° : 1(8)
Total generalized cost of all road vehicles for the iteration : 1,291 E+6  - (Total generalized cost of iteration (1) Empty network : 1,291 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 3
Matrices n° : 1(8)
Total generalized cost of all road vehicles for the iteration : 1,291 E+6  - (Total generalized cost of iteration (1) Empty network : 1,291 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 4
Matrices n° : 1(8)
Total generalized cost of all road vehicles for the iteration : 1,291 E+6  - (Total generalized cost of iteration (1) Empty network : 1,291 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 5
Matrices n° : 1(8)
Total generalized cost of all road vehicles for the iteration : 1,291 E+6  - (Total generalized cost of iteration (1) Empty network : 1,291 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Termination condition : Number max of iterations reached
 

________________________________________________________
Writing QGis files ...
________________________________________________________
Total execution time (1 scenario(s)) : 2 second(s)
    Data loading : 2 second(s)
    Data checking and building : 0 second(s)
    Calculation time : 0 second(s)
    Writing QGIS .csv files : 0 second(s)
________________________________________________________
Calculation completed
The results are in the directory : "_out_results_wkt"

