Program version : Portable_Q-Traf_1355

> Loaded file parameters Mise en forme : E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Small_Ullapool_v1355\_Q-Traf_parameters\parameters.csv
Run number 199 du 251124_01h19
________________________________________________________

------------- VEHICLE - PARENT TYPES ------------------------------------------
Vehicle parent types count :      4

------------- VEHICLE - SUB PARENT TYPES ----------------------------------------
Vehicle sub parent types count :      4

------------- VEHICLE - SUB SUB PARENT TYPES = TRIPS MATRICES ------------------
Trips matrices count (per scenario) :   1

------------- Links categories ---------------------------------------------
links categories Count : 21
________________________________________________________

Scenario(s) count :                2
________________________________________________________
                           <<  WARNING ! All arbo  >>

------------- ZONES -------------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Small_Ullapool_v1355\_traffic_model_data\network_nodes_geojson\ullapool_network_nodes_zones_v10.geojson
Number of zones : 12 - id_max_zone : 13 (Number of zones autorized : 3000)

------------- PARK & RIDE --------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Small_Ullapool_v1355\_traffic_model_data\network_nodes_geojson\ullapool_network_nodes_PR_v10.geojson
Number of P&R : 1 - id_max_Park_&_Ride : 2

----------- (NETWORK) LINKS --------------------------------
E:\Q-Traf\Q-Traf_Reseaux\Q-Traf_Small_Ullapool_v1355\_traffic_model_data\network_links_geojson\Ullapool_network_links_v10.geojson
Number of links in the network (without connectors) : 74
Number of links and connectors : 98 (autorized : 1500)

 ------------- NODES ------------------------
Number of nodes in the network (only link s ends - Without zones) : 29 - Id node max (with zones) : 42 (autorized : 3000)
Diameter of the network beetwen zones : 9 links (shortest paths beetwen x 1,5 et x 2,7)

________________________________________________________
CALCULS ASSIGNATION
Time (sec) ponderation / dist (m) in generalised cost travel : 25
Number of iterations (1..200) :  (5 iteration(s))

______________________________________________________
SCENARIO 1 : Network 2025

Matrix n° 1 de 2025 - Car11 (matrix_ullapool_9_2025_Car11_PPH.csv)
    Zones matrice absente(s) du reseau : Origine(s) :  - Destination(s) : 
    Number of OD in the file matrice csv : 12

Matrix n° 1  -  matrix_ullapool_9_2025_Car11_PPH.csv   -    TOTAL (100%) : 1145 - Autorized (100%) : 1145 Car11

Iteration n° 1
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,988 E+6

Iteration n° 2
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,988 E+6  - (Total generalized cost of iteration (1) Empty network : 1,988 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 3
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,988 E+6  - (Total generalized cost of iteration (1) Empty network : 1,988 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 4
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,988 E+6  - (Total generalized cost of iteration (1) Empty network : 1,988 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 5
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,988 E+6  - (Total generalized cost of iteration (1) Empty network : 1,988 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Termination condition : Number max of iterations reached
 


______________________________________________________
SCENARIO 2 : Network 2035

Matrix n° 1 de 2025 - Car11 (matrix_ullapool_9_2025_Car11_PPH.csv)
    Zones matrice absente(s) du reseau : Origine(s) :  - Destination(s) : 
    Number of OD in the file matrice csv : 12

Matrix n° 1  -  matrix_ullapool_9_2025_Car11_PPH.csv   -    TOTAL (100%) : 1145 - Autorized (100%) : 1145 Car11

Iteration n° 1
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,996 E+6

Iteration n° 2
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,996 E+6  - (Total generalized cost of iteration (1) Empty network : 1,996 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 3
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,996 E+6  - (Total generalized cost of iteration (1) Empty network : 1,996 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 4
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,996 E+6  - (Total generalized cost of iteration (1) Empty network : 1,996 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Iteration n° 5
Matrices n° : 1(16)
Total generalized cost of all road vehicles for the iteration : 1,996 E+6  - (Total generalized cost of iteration (1) Empty network : 1,996 E+6)
Generalized cost variation for all road vehicles with iteration 1 : 0 %
Links with more than 1% traffic flow diff between previous iteration : 0 %

Termination condition : Number max of iterations reached
 

________________________________________________________
Writing QGis files ...
________________________________________________________
Total execution time (2 scenario(s)) : 3 second(s)
    Data loading : 2 second(s)
    Data checking and building : 0 second(s)
    Calculation time : 1 second(s)
    Writing QGIS .geojson and .csv files : 0 second(s)
________________________________________________________
Calculation completed
The results are in the directory : "_out_results"